When a business runs at full capacity, the key question becomes: which product makes the most money per hour? That’s exactly what Don’s Donuts faced when comparing their original donut recipe to a new one called “The Special.”
🍩 The Setup
Don’s Donuts uses a 3-step process to make donuts. Each step has one worker, and each dozen of regular donuts takes:
- Step 1: 5 minutes
- Step 2: 15 minutes
- Step 3: 1 minute
Each dozen costs $5 and sells for $10, giving a margin of $5/dozen.
🧁 The New Recipe: “The Special”
The founder created a new recipe using higher-quality ingredients. It costs $8/dozen and sells for $12, giving a margin of $4/dozen. But it’s faster to make:
- Step 1: 5 minutes
- Step 2: 10 minutes
- Step 3: 4 minutes
⏱️ Bottleneck Analysis
Since each step has one worker, the slowest step determines the production rate. For regular donuts, Step 2 is the bottleneck at 15 minutes/dozen:
60 minutes / 15 minutes = 4 dozens/hour Profit = 4 × $5 = $20/hour
For The Specials, Step 2 is faster (10 minutes), but Step 3 is slower (4 minutes). The new bottleneck is Step 3:
60 minutes / 10 minutes = 6 dozens/hour Profit = 6 × $4 = $24/hour
💡 Decision: Make Only The Specials
Even though The Specials have a lower margin per dozen, they generate more profit per hour:
$24/hour − $20/hour = $4/hour more
That’s why Don’s Donuts decided to switch entirely to The Specials.
🧠 What Students Should Learn
- ✔ Always analyze profit per hour, not just per unit
- ✔ Bottlenecks determine capacity
- ✔ Faster production can outweigh lower margins
🚫 Common Mistakes
- ❌ Comparing margins without considering time
- ❌ Ignoring bottlenecks in multi-step processes
- ❌ Assuming higher ingredient cost means lower profitability
Need help with your own product mix or operations homework? Reach out directly — fast, expert help with no middlemen.

Leave a Reply